Other editions. On the Bakery & Catering edition this screen is Bakes in Progress; on Reservation ERP (Gold) it is Cooking Batches. Everything below works the same way.
A production batch is how production without a fixed recipe works: a job in work in progress that takes its ingredients as often as it needs (a stew that gets the stock in the morning and the cream at the end, a wedding order baked over two days, a trial batch you top up as you go) and gives its output as it comes. The batch is the thing all those issues and receipts attach to, so you can always see what has gone in, what has come out, and what is still in work in progress. This page is the whole cycle; Issue raw materials to a production batch and Receive finished goods from a production batch cover each half in more detail.
A job that takes its ingredients once can still be issued without a batch and received against that single issue; both manuals above say how.
Before you start
- The ingredients must be in stock in the department you issue from, and each must be marked Consumable Without Sales on its item.
- The finished products must exist as Inventory items.
- The company needs a work-in-progress account (a current asset). Opening New production batch creates the standard one, ManufacturingAccount, if your chart of accounts has none, and the dialog opens with it already selected.
- Decide which department does the work (the bakery floor, the kitchen). Ingredients can still be issued from a store, and output can go into the shop.
Steps
Start the batch
- Open Manufacturing → Production Batches and press New production batch.
- Say what it is making ("Saturday wedding order: 3 tiered cakes and 200 rolls"), pick the department doing the work, and leave the work-in-progress account on the company's one unless your accountant set up another.
- Press Start batch. The batch opens with nothing in it yet and a number like PB-12.
Put ingredients in, as often as you need
- On the batch, press Issue raw materials to this batch. A raw-material issue opens already linked to the batch, with the department and the work-in-progress account filled in.
- Add one line per ingredient with the quantity, write what this stage is for in Purpose ("Dough", "Filling"), and Save. The stock leaves the store now and the value goes into the batch's work in progress.
- Come back and do it again each time more ingredients go in. The batch shows every issue, and Issued into the batch adds them up.
You can also link an issue to a batch from the issue itself: on Consume Raw Materials, pick the batch under Production batch this issue feeds.
Take output out, as it comes
- When something is finished, press Receive finished goods from this batch. A receipt opens linked to the batch and set to Cost from a production batch.
- Choose the department the goods go into, add one line per product with the quantity, and set the share of what is in the batch (%): 100 if everything in the batch so far belongs to this output, less if more is still to come out of it. The share is always of what is in the batch at that moment: after a receipt took 50, the next one shows 100 because it takes all of what remained. Press Spread the value over the lines and the receipt costs the goods from that share of what is in work in progress. The line under the batch says whether the lines match that value.
- Save. The goods are in stock, and Received as finished goods on the batch goes up by what the receipt carried. Still in work in progress goes down by the same.
- Do it again for the next tray, the next tier, the next pot.
A receipt can never take more out of the batch than is in it, so work in progress never goes negative. If the message says the lines carry more than is left, press Spread, or issue the remaining ingredients first.
Close the batch
- When the job is done, press Close batch. If nothing is left in work in progress,
the batch simply closes. If something is left, choose how to settle it:
- Spread it over the receipts when everything that came out has been received and the ingredients were simply dearer than first costed: every finished good from the batch has its cost scaled up (or down) so the outputs carry the whole cost.
- Write it off when ingredients did not become sellable goods: a journal moves the remainder from work in progress to the account you pick, such as spoilage or waste.
- After closing, the batch's issues and receipts can no longer be changed, and the batch shows how it was settled. Reopen undoes a write-off (its journal is reversed) or a plain close; a spread cannot be undone.
A batch that makes one product in several sizes
When the same mix comes out as several sizes (a sponge cake in 8 g, 12 g and 14 g, a soap in 2 oz, 4 oz and 8 oz), set the product up once as a product family (see Make one product in several sizes) and pick it when you start the batch.
- On New production batch, choose the Product family. Everything else is as above.
- Issue the materials to the batch as usual, as often as needed.
- Press Receive finished goods from this batch and choose the department the goods go into. The sizes are listed for you. Type the pieces produced of each size that came off; leave the others empty.
- There is no share to enter and no Spread to press. Each size shows its cost each and value, worked out from the family standard and what was issued, and could still make shows what the materials left after this receipt allow.
- Save. Repeat each time more output comes off, then close the batch as above.
The batch page gains a panel for the family: pieces and value received per size, and for each material what was issued, what the receipts used at standard, and what is left. The line above it says how many more units the remaining materials make and which material runs out first.
If a receipt asks for more than the standard says is left, you get a warning and can still save. Issue the extra materials to the batch, or the shortfall is left out of the cost and settled when the batch is closed.
Tips
- One batch per job, named so the baker recognises it: "Tuesday cinnamon rolls", "Order 1042". Not one batch per day.
- Issue ingredients when they actually go in, dated that day. Costing is "cost to date": a receipt taken before the last ingredient goes in draws only on what has been issued so far, and the close-out true-up corrects it. If you prefer every receipt costed in full, issue everything first.
- Look at What went in and What came out on the batch before closing: the per-unit figures are the real cost of each product from this job.
- If the same thing is made the same way every time, a recipe and a production run do all of this in one step and work the cost out for you.
Common problems
- "Documents in production batch PB-7 must post to its work-in-progress account" → the issue or receipt was switched to another account. Put it back on the batch's account (the one named in the message); the forms fill it in for you when you pick the batch.
- "Production batch PB-7 is closed" → you are trying to add to, change or delete a document in a closed batch. Open the batch and press Reopen first, or use another batch.
- "The lines carry X but only Y is left in this batch's work in progress" → the receipt would take more out of the batch than is in it. Press Spread the value over the lines, lower a cost you typed by hand, or issue the remaining ingredients first.
- Close batch says something is still in work in progress → pick Spread or Write off. Spread is greyed out when nothing has been received yet; receive the output first or write the remainder off.
- "This batch was closed by spreading the remainder over its receipts … cannot be reopened" → the receipts' costs already carry the whole batch. Start a new batch for any further work.
- The batch is not offered in the picker → only open batches are offered. Reopen it, or check you are on a raw-material issue (not a normal consumption) or a finished-goods receipt.
- You cannot see the screen → it needs the Consume Production permission, the same one as Consume Raw Materials. Ask your administrator.